Thermal Power Plants
Boilers, ESPs and FGD absorbers for utility and captive power — from 10 TPH WHRBs to 2 × 660 MW units.
We are not just a service provider — we are a site-driven execution partner known for taking over challenging, delayed, or partially executed jobs and delivering them within committed timelines.



21+
Years of site execution
Continuously since 2005
82
Projects executed
For EPC majors and plant owners
500+
Staff & workforce
Engineers, fitters, IBR welders
2 × 660 MW
Largest FGD package
OPGC Jharsuguda, in progress
Every discipline below is executed by our own supervisors and workforce — not brokered out. That is what lets us hold a shutdown window.
Complete boiler erection — pressure and non-pressure parts — from 10 TPH WHRBs to 275 TPH CFBC units.
DetailsFull-scale ESP erection, plus revamping and rectification of defective installations.
DetailsHeavy-duty flue gas ducts and absorber tanks, including circular absorbers for 660 MW units.
DetailsComplete bag house assemblies, integrated with ducting in brownfield and space-constrained conditions.
DetailsHeavy load-bearing structures, equipment supporting frames, platforms and access systems.
DetailsUtility and process piping — fabrication, fit-up, hydro-testing and commissioning support.
DetailsContractors get replaced when a site stalls. We are usually the ones called in afterwards — which is why our capability is measured in mobilisation speed and recovery, not just scope.

Deployment of manpower within short notice.
Proven ability to take over stalled or disputed sites.
Skilled workforce adaptable to multi-discipline jobs.
Immediate engineering adjustments as per site conditions.
Commitment to milestone-based progress.
Optimized execution without unnecessary overheads.
We work as an execution partner to EPC majors and directly for plant owners. Every name below appears in our project record.
Our current packages — a CFBC and WHR boiler revamp, an FGD absorber at 660 MW scale, and a 160 TPH CFBC boiler under erection.
Under progressSeraikela Steel Plant, Seraikela, Jharkhand
Rungta Sons Pvt. Ltd., Seraikela, Jharkhand · 2026
Under progressOPGC, Jharsuguda, Odisha
Isgec Heavy Engineering Ltd., Noida, U.P. · 2025-26
Under progressShri Bajrang Power & Ispat Ltd., Tilda, Raipur
Shri Bajrang Power and Ispat Ltd., Raipur · 2026
Two decades across heavy process industry — most of it inside live, operating plants.

Boilers, ESPs and FGD absorbers for utility and captive power — from 10 TPH WHRBs to 2 × 660 MW units.

Two decades inside Tata Steel Jamshedpur alone — sinter plant APC, power house boilers, gas pipelines and SMS structures.

Waste heat recovery boiler packages, preheater and AQC boilers with ESPs and auxiliaries.

CFBC boilers, ESPs and process piping for chemical, paper and sugar process plants.
Send us the scope and the date it has to be handed over. We will tell you what it takes to hit it — and mobilise within days, not weeks.